Three complex Box-Jacked subways were successfully constructed on Doha’s Gold Line Metro project between 2016 and 2017, with no disruption to traffic. Here the authors describe the design scheme and construction sequence, together with detailed design inputs for the jacking loads, settlement analysis, ground stability and structural analysis. The challenges faced during construction are also presented, including settlement protection of utilities, effects of over excavation, and lessons learnt.